total manufacturing overhead cost
=estimated fixed manOH cost + estimated variable manOH cost per unit (estimated total amount of the allocation base)
The goto resource for studying materials
total manufacturing overhead cost
=estimated fixed manOH cost + estimated variable manOH cost per unit (estimated total amount of the allocation base)