COGMex: assume job A was completed. transfer the cost of job A from WIP to FG,”finished goods—-158,000—-work in progress—-158
000″
The goto resource for studying materials
COGMex: assume job A was completed. transfer the cost of job A from WIP to FG,”finished goods—-158,000—-work in progress—-158
000″