“In the calendarized schedule for building your dream cabin, at the end of week 5 EV = $88,000, PV = $70,500, and BAC = $156,250. If AC was $72,400 at the end of week 5, what is the SV?”,”$17

Average Rating
0 out of 5 stars. 0 votes.

“In the calendarized schedule for building your dream cabin, at the end of week 5 EV = $88,000, PV = $70,500, and BAC = $156,250. If AC was $72,400 at the end of week 5, what is the SV?”,”$17

500SV is calculated by EV − PV.”