Characteristic displayed by a generic life cycle display,”Cost and staffing levels are low at the start, peak as the work is carried out and drop rapidly as project draws to a close. Risk and uncertainty is greatest at start

Average Rating
0 out of 5 stars. 0 votes.

Characteristic displayed by a generic life cycle display,”Cost and staffing levels are low at the start, peak as the work is carried out and drop rapidly as project draws to a close. Risk and uncertainty is greatest at start

the ability to influence with out impact to cost is highest at the start.”