The difference between the static and the flexible budget is called:

a. static budget variance
b. production volume variance
c. flexible budget variance
Selected: d. sales volume variance This answer is correct.

Correct! The difference between the static and flexible budget is called the sales volume variance and is reconcilable to the difference in base units x contribution margin/unit.