Which of the following would be considered a prime​ cost?A. The wages of the assembly workersB. The salary of the production managerC. Factory rentD. None of the above

Average Rating
0 out of 5 stars. 0 votes.

Which of the following would be considered a prime​ cost?A. The wages of the assembly workersB. The salary of the production managerC. Factory rentD. None of the above

A. The wages of the assembly workers