Backward pass,”Calculating late start and late finish dates by starting at the end of a network diagram and working back through each path until reaching the start of the network diagram. This is part of critical path method (CPM)

Average Rating
0 out of 5 stars. 0 votes.

Backward pass,”Calculating late start and late finish dates by starting at the end of a network diagram and working back through each path until reaching the start of the network diagram. This is part of critical path method (CPM)

which is a mathematical technique to develop the project schedule.”