COGMex: assume job A was completed. transfer the cost of job A from WIP to FG,”finished goods—-158,000—-work in progress—-158

Average Rating
0 out of 5 stars. 0 votes.

COGMex: assume job A was completed. transfer the cost of job A from WIP to FG,”finished goods—-158,000—-work in progress—-158

000″