Controlling,”Performance measures are taken and analyzed to determine if a project is on track if variances exist

Average Rating
0 out of 5 stars. 0 votes.

Controlling,”Performance measures are taken and analyzed to determine if a project is on track if variances exist

corrective action may be taken to get project activities aligned with the project plan.”