Costs: Direct vs. Indirect,”-Direct: assigned to the cost object, can be traced to a cost object (direct material or direct labor)-Indirect: relates to object but not directly

Average Rating
0 out of 5 stars. 0 votes.

Costs: Direct vs. Indirect,”-Direct: assigned to the cost object, can be traced to a cost object (direct material or direct labor)-Indirect: relates to object but not directly

allocated and called overhead”