“One of Matheny Company’s activity cost pools is inspecting, with estimated overhead of $200,000. Matheny produces throw rugs (700 inspections) and area rugs (1,300 inspections). How much of the inspecting cost pool should be assigned to throw rugs?”,”$70

Average Rating
0 out of 5 stars. 0 votes.

“One of Matheny Company’s activity cost pools is inspecting, with estimated overhead of $200,000. Matheny produces throw rugs (700 inspections) and area rugs (1,300 inspections). How much of the inspecting cost pool should be assigned to throw rugs?”,”$70

000.”