Seven run rule,”If seven data points in a row on a quality control chart are all below the mean, above the mean, or are all increasing or decreasing

Average Rating
0 out of 5 stars. 0 votes.

Seven run rule,”If seven data points in a row on a quality control chart are all below the mean, above the mean, or are all increasing or decreasing

then the process needs to be examined for nonrandom problems”