Work package,”The lowest level in a WBS. Team assignments, time estimates, and cost estimates can be made at this level. On very large projects

Average Rating
0 out of 5 stars. 0 votes.

Work package,”The lowest level in a WBS. Team assignments, time estimates, and cost estimates can be made at this level. On very large projects

this level is handed off to subproject managers who develop their own WBS to fulfill the requirements of the work package deliverable.”